Rainbow Six Wiki
Rainbow Six Wiki
Tag: Visual edit
Tag: Visual edit
Line 43: Line 43:
 
Club House received a map buff as part of Operation Para Bellum. Map buffs are changes made to an existing map in order to make it more competitive and have better flow. Decor throughout the map was also changed. The following are changes to the map:
 
Club House received a map buff as part of Operation Para Bellum. Map buffs are changes made to an existing map in order to make it more competitive and have better flow. Decor throughout the map was also changed. The following are changes to the map:
 
*Basement
 
*Basement
:*Basement has received the least amount of changes.
+
**Basement has received the least amount of changes.
:*Utility Room: A new hallway and staircase has been added to the east wall of the room, below the ceiling hatch. The hall and stairs connect to Garage Storage.
+
**Utility Room: A new hallway and staircase has been added to the east wall of the room, below the ceiling hatch. The hall and stairs connect to Garage Storage.
*First Floor
 
:*First Floor has received multiple changes, including new rooms.
 
:*Garage
 
::*The ladder to the balcony has been replaced by a set of stairs.
 
::*A new window has been added between Garage balcony and CCTV Room to the right of the soft wall.
 
::*The drone vent between Garage balcony and CCTV Rome has been removed.
 
:*Garage Storage
 
::*A new staircase has been added along the west wall of the room leading to Utility Room in the Basement.
 
:*Bar
 
::*Bar has been split into three rooms: Stage, Bar, and Pool Table.
 
::*The walls between Stage and Bar have been extended to allow for a barricade between the rooms.
 
::*Full walls have been added between the Pool Table and Bar and the stairs to Pool Table moved to allow for a barricade between the rooms.
 
::*The door to Western Hallway has been removed and has been replaced by a soft wall. The wall is closer to the door to Central Hallway.
 
:*Stage
 
::*A new room made out of a section of Bar.
 
::*Now in between Lobby and Bar.
 
::*A new hatch above the room has been added directly above the stage itself.
 
:*Pool Table
 
::*A new room made out of a section of Bar.
 
::*Now between Bar and Western Hallway.
 
:*Western Hallway
 
::*The hall has been extended to the east and connects to the new rooms Pool Table and Toilets.
 
:*Toilets
 
::*A new room added off of the north wall of the new Western Hallway extension.
 
::*Connects to Western Hallway and Central Hallway.
 
::*Drone vent on the north wall.
 
:*Central Hallway
 
::*A new doorway has been added to the west wall to connect to Toilets.
 
*Second Floor
 
*Second Floor has received multiple changes, including the removal of access points and a new structure and room.
 
:*Gym
 
::*The rooftop hatch has been removed.
 
:*Bedroom
 
::*The window on the southeast side of the wall has been removed.
 
::*The east soft wall has been changed to a hard wall with a doorway in the southeast corner that leads to the new room and structure, Construction.
 
:*Construction
 
*An entirely new room and new structure.
 
::*Replaces Central Sub-roof.
 
::*Connects to Bedroom and Cash Room.
 
::*Contains the following features:
 
:::*A window on the south wall.
 
:::*A soft wall in the northeast corner, opposite of the outside balcony over the entrances to Central Hallway and Stock Room.
 
:::*A floor hatch above Stage, directly over the actual stage.
 
:::*The soft wall to Logistics Office still exists.
 
:*Logistics Office
 
::*The rooftop hatch has been moved slightly.
 
:*Cash Room
 
::*The west soft wall has been changed to a hard wall with a doorway in the northwest corner that leads to the new room and structure, Construction.
 
::*The window on the north wall has been removed.
 
::*The furniture within the room has been rearranged.
 
:*CCTV Room
 
::*The rooftop hatch has been removed.
 
::*A new window has been added between CCTV Room and Garage balcony to the left of the soft wall. 
 
::*The drone vent between Garage balcony and CCTV Rome has been removed.
 
   
 
*First Floor
 
**First Floor has received multiple changes, including new rooms.
 
**Garage
 
***The ladder to the balcony has been replaced by a set of stairs.
 
***A new window has been added between Garage balcony and CCTV Room to the right of the soft wall.
 
***The drone vent between Garage balcony and CCTV Rome has been removed.
 
**Garage Storage
 
***A new staircase has been added along the west wall of the room leading to Utility Room in the Basement.
 
**Bar
 
***Bar has been split into three rooms: Stage, Bar, and Pool Table.
 
***The walls between Stage and Bar have been extended to allow for a barricade between the rooms.
 
***Full walls have been added between the Pool Table and Bar and the stairs to Pool Table moved to allow for a barricade between the rooms.
 
***The door to Western Hallway has been removed and has been replaced by a soft wall. The wall is closer to the door to Central Hallway.
 
**Stage
 
***A new room made out of a section of Bar.
 
***Now in between Lobby and Bar.
 
***A new hatch above the room has been added directly above the stage itself.
 
**Pool Table
 
***A new room made out of a section of Bar.
 
***Now between Bar and Western Hallway.
 
**Western Hallway
 
***The hall has been extended to the east and connects to the new rooms Pool Table and Toilets.
 
**Toilets
 
***A new room added off of the north wall of the new Western Hallway extension.
 
***Connects to Western Hallway and Central Hallway.
 
***Drone vent on the north wall.
 
**Central Hallway
 
***A new doorway has been added to the west wall to connect to Toilets.
  +
 
*Second Floor
 
** Second Floor has received multiple changes, including the removal of access points and a new structure and room.
 
**Gym
 
***The rooftop hatch has been removed.
 
**Bedroom
 
***The window on the southeast side of the wall has been removed.
 
***The east soft wall has been changed to a hard wall with a doorway in the southeast corner that leads to the new room and structure, Construction.
 
**Construction
 
***An entirely new room and new structure.
 
***Replaces Central Sub-roof.
 
***Connects to Bedroom and Cash Room.
 
***Contains the following features:
 
****A window on the south wall.
 
****A soft wall in the northeast corner, opposite of the outside balcony over the entrances to Central Hallway and Stock Room.
 
****A floor hatch above Stage, directly over the actual stage.
 
****The soft wall to Logistics Office still exists.
 
**Logistics Office
 
***The rooftop hatch has been moved slightly.
 
**Cash Room
 
***The west soft wall has been changed to a hard wall with a doorway in the northwest corner that leads to the new room and structure, Construction.
 
***The window on the north wall has been removed.
 
***The furniture within the room has been rearranged.
 
**CCTV Room
 
***The rooftop hatch has been removed.
 
***A new window has been added between CCTV Room and Garage balcony to the left of the soft wall. 
 
***The drone vent between Garage balcony and CCTV Rome has been removed.
 
{{Maps/R6Siege}}
 
{{Maps/R6Siege}}
 
[[Category:Siege Maps]]
 
[[Category:Siege Maps]]

Revision as of 23:24, 22 May 2018

REACT Logo "A lot of eyes are on us this time, especially since we have poor intel."
This article, Clubhouse, is a stub and may require expansion. Please help out by editing the page.

"This map depicts an assault on a biker gang clubhouse. Featuring a full bar, gaming tables and leather furniture, this mixed interior/exterior layout offers a host of interesting tactical possibilities for both attacker and defender."
— Ubisoft Description


Clubhouse is a map featured in Tom Clancy's Rainbow Six Siege.

Situations

This map is used in Situation 9: Improvise Defense. In this situation you play as Kapkan. You are defending a hostage located in the Church room, against 3 waves of terrorists. There are no Bombers, and there are fewer enemies per wave. Additionally, the hostage will use the unique Recruit model that appears in Situation 6.

Features

  • 4 Attacker spawning locations
  • Main Gate
  • Shipping Dock
  • Warehouse
  • Construction Site
  • 4 Defender objective locations
  • Gym and Bedroom
  • CCTV Room and Cash Room
  • Bar and Stock Room
  • Church and Arsenal Room
  • Bedroom
  • Arsenal Room
  • Bar
  • Garage
  • Bedroom
  • Cash Room
  • Strip Club
  • Church
  • 8 Trap Doors

Map Buff

Club House received a map buff as part of Operation Para Bellum. Map buffs are changes made to an existing map in order to make it more competitive and have better flow. Decor throughout the map was also changed. The following are changes to the map:

  • Basement
    • Basement has received the least amount of changes.
    • Utility Room: A new hallway and staircase has been added to the east wall of the room, below the ceiling hatch. The hall and stairs connect to Garage Storage.
  • First Floor
    • First Floor has received multiple changes, including new rooms.
    • Garage
      • The ladder to the balcony has been replaced by a set of stairs.
      • A new window has been added between Garage balcony and CCTV Room to the right of the soft wall.
      • The drone vent between Garage balcony and CCTV Rome has been removed.
    • Garage Storage
      • A new staircase has been added along the west wall of the room leading to Utility Room in the Basement.
    • Bar
      • Bar has been split into three rooms: Stage, Bar, and Pool Table.
      • The walls between Stage and Bar have been extended to allow for a barricade between the rooms.
      • Full walls have been added between the Pool Table and Bar and the stairs to Pool Table moved to allow for a barricade between the rooms.
      • The door to Western Hallway has been removed and has been replaced by a soft wall. The wall is closer to the door to Central Hallway.
    • Stage
      • A new room made out of a section of Bar.
      • Now in between Lobby and Bar.
      • A new hatch above the room has been added directly above the stage itself.
    • Pool Table
      • A new room made out of a section of Bar.
      • Now between Bar and Western Hallway.
    • Western Hallway
      • The hall has been extended to the east and connects to the new rooms Pool Table and Toilets.
    • Toilets
      • A new room added off of the north wall of the new Western Hallway extension.
      • Connects to Western Hallway and Central Hallway.
      • Drone vent on the north wall.
    • Central Hallway
      • A new doorway has been added to the west wall to connect to Toilets.
  • Second Floor
    • Second Floor has received multiple changes, including the removal of access points and a new structure and room.
    • Gym
      • The rooftop hatch has been removed.
    • Bedroom
      • The window on the southeast side of the wall has been removed.
      • The east soft wall has been changed to a hard wall with a doorway in the southeast corner that leads to the new room and structure, Construction.
    • Construction
      • An entirely new room and new structure.
      • Replaces Central Sub-roof.
      • Connects to Bedroom and Cash Room.
      • Contains the following features:
        • A window on the south wall.
        • A soft wall in the northeast corner, opposite of the outside balcony over the entrances to Central Hallway and Stock Room.
        • A floor hatch above Stage, directly over the actual stage.
        • The soft wall to Logistics Office still exists.
    • Logistics Office
      • The rooftop hatch has been moved slightly.
    • Cash Room
      • The west soft wall has been changed to a hard wall with a doorway in the northwest corner that leads to the new room and structure, Construction.
      • The window on the north wall has been removed.
      • The furniture within the room has been rearranged.
    • CCTV Room
      • The rooftop hatch has been removed.
      • A new window has been added between CCTV Room and Garage balcony to the left of the soft wall. 
      • The drone vent between Garage balcony and CCTV Rome has been removed.